Mr. Reilly was the Construction Manager for this Design-Build project to furnish complete design drawings, calculations and specifications as well as pipeline construction and cross connection testing to convert 21 acres of landscaping areas, parade grounds and ball fields previously irrigated by drinking potable water to the City of San Diego’s reclaimed water system saving 29 million gallons of potable water usage per year. Value of the project was $3.5M

Key Metrics

Client:
NAVFAC Southwest - Department of the Navy
Construction Value:
$3.5 million
Project Includes:
Convert 21 acres of landscaping areas, parade grounds and ball fields previously irrigated by drinking potable water to the City of San Diego’s reclaimed water system
Duration:
550 Calendar Days