Elsinore Valley Municipal Water District Manhole Rehabilitation Fiscal Years 2021-2022
Project Overview
Rehabilitate seven (7) existing 5-foot diameter manholes located within the Caltrans Right-of-Way and Lakeland Village areas using a District approved epoxy lining method and replacing four (4) 4-foot diameter manholes with 5-foot diameter manholes to meet current District standards all per Technical Specifications including furnishing all labor, material, tools, and equipment and performing all work required for inspection, testing, surface preparation, water blasting, debris removal, bench rehabilitation, manhole inserts, and surface restoration per EVMWD standards.
Key Metrics
Client:
Elsinore Valley MWD
Construction Value:
$525,000
Project Includes:
Rehabilitate seven (7) existing 5-foot diameter manholes and replace four (4) 4-foot diameter manholes to 5-foot diameter manholes to meet EVMWD standards.
Duration:
6 months